Service · Decking
Softwood and composite decking for seafront balconies, holiday-let rear yards, and garden lifts in Palm Bay, Cliftonville and Westbrook.
A standard 4m x 3m deck: 2-3 working days including sub-frame. Larger raised decks with balustrade: 3-5 days.
Softwood vs composite on the Thanet coast. Softwood UC4 gives 8-12 years on a Cliftonville seafront deck before board replacement. Composite (WPC) gives 20+ years but colour-fades in salt-UV faster than the manufacturer literature suggests. Composite is the honest answer for holiday lets where zero maintenance matters; softwood is the honest answer for owner-occupied gardens where a re-oil every 2 years is acceptable.
Grooved vs smooth boards. On any Margate deck - especially north-facing seafront balconies at Palm Bay and Cliftonville - use grooved anti-slip boards. Smooth softwood decks in Thanet salt-wet get dangerous.
Building Regulations trigger. Decks under 30m² and less than 300mm above ground are permitted development. Over 600mm above ground you need a Building Regs-compliant balustrade (1.1m high, 100mm gap max between spindles).
Standard softwood UC4 deck at ground level: £140-190 per m² installed. Raised softwood deck with balustrade: £190-260 per m². Composite (WPC) decking at ground level: £220-320 per m². Composite raised with balustrade: £280-400 per m².
Standards on every job
UC4-pressure-treated timber Concrete posts & gravel boards Fixed price A proper job or you pay nothingPhotos, metres and postcode to hello@margatefencing.co.uk or WhatsApp 07763 100 477. Instant quote on straightforward jobs, site visit on the rest. WhatsApp works too.
Send a couple of photos, panel or gate counts, and your postcode. Instant quote on WhatsApp, verified with a site visit if the run needs it.